Mar. 14th, 2017

janestarz: (Default)
This morning I sent in my "finished" mail with links, and an hour or two later I got the liberating answer. This pair of socks has qualified me for the next round of Sock Madness!

Twisted Madness complete 2


The first sock took the longest, having to redo the gusset several times. The second sock was cast on on Saturday afternoon. I was almost done with the gusset by Sunday night and did the heel turn on Monday morning before school. I pushed through on Monday evening, knitting until midnight (with a break), and finished the toe this morning.

Taking pictures, updating the Ravelry project page and then sending the required e-mail was the final thing to do.

I've got at least two days off, as I finished this round a bit earlier than the absolute deadline. There's no telling when the next sock pattern will be availalbe, but it's nice to have a bit of recuperation time after the mad dash of the first round.

Profile

janestarz: (Default)
janestarz

April 2026

S M T W T F S
    1234
5 678 910 11
12 1314 15 161718
19202122232425
2627282930  

Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Apr. 17th, 2026 09:27 pm
Powered by Dreamwidth Studios